Sainsbury’s Strathaven
Location: Strathaven
Project Category: Retail and Supermarket Construction
Project Start: 7 September 2009
Project End: 17 March 2010
Project Images
Awards & Recognition:
Considerate constructors awarded the site 37 points out of 40
best ever score for a Barr site
Key Features: The project incorporated several environmental initiatives including Biomass boiler, Rainwater harvesting and sun pipes to sales floor.Siberian larch cladding was used on the external elevations to enhance the appearance.
The demolition of existing Abattoir and Auction mart buildings and construction of new format 25 supermarket. Works included stabilisation of existing slope on boundary of site and enhancement of the highways infrastructure.